Commercial Portfolio · Fire rebuild

A burned-out warehouse, built back.

A fire tore through this bow-truss warehouse in the City of Los Angeles and took the roof with it. INVICTA cleared the debris, re-framed the arched roof, put on a new roof deck, blasted the brick clean and started the new interior — turning a total loss back into a usable building.

Location
City of Los Angeles
Building
Brick warehouse · bow-truss roof
Project type
Commercial fire rebuild
Scope
Demo · roof framing · roof deck · exterior · interior
Warehouse fire rebuild · City of Los Angeles
The rebuilt warehouse interior with new roof, skylights and new interior walls
The same warehouse after the fire: roof burned open, charred walls and debris on the floor
After the fireRebuilt

Before & after

Same building. Back from a total loss.

Drag the slider. On the left is the warehouse after the fire: roof burned open, walls charred and debris everywhere. On the right is the same building with a new roof, skylights and new interior walls.

  • Fire debris removedBurned roof, walls and contents cleared with telehandlers, skid steers and lifts
  • Bow-truss roof rebuiltNew framing across the arched trusses and a new plywood roof deck
  • Exterior restoredBrick blasted clean and openings secured
  • New interiorSlab trenching, new interior walls and new skylights

How we built it

Eight phases from fire damage to rebuild.

A fire rebuild starts with what’s left standing. Here’s how this warehouse came back.

  1. Fire damage & assessment during the Los Angeles warehouse fire rebuild
    01

    Fire damage & assessment

    We walked the burned-out building, documented the damage and sorted what could be saved from what had to come out.

  2. Demo & debris haul-out during the Los Angeles warehouse fire rebuild
    02

    Demo & debris haul-out

    Telehandlers, skid steers and lifts cleared the burned roof, walls and debris down to the structure that stays.

  3. Cleared to the trusses during the Los Angeles warehouse fire rebuild
    03

    Cleared to the trusses

    With the debris out, the arched bow-truss frame and brick walls were exposed so the rebuild could start clean.

  4. Bow-truss roof re-framed during the Los Angeles warehouse fire rebuild
    04

    Bow-truss roof re-framed

    Damaged roof framing replaced with new lumber across the arched trusses, rebuilding the warehouse’s signature curved roof.

  5. New roof deck during the Los Angeles warehouse fire rebuild
    05

    New roof deck

    The re-framed roof sheathed with new plywood decking, closing the building back in.

  6. Exterior brick blasted clean during the Los Angeles warehouse fire rebuild
    06

    Exterior brick blasted clean

    Crews on lifts blasted the exterior brick, and openings were boarded and secured.

  7. Slab trenching during the Los Angeles warehouse fire rebuild
    07

    Slab trenching

    The floor slab trenched along the walls for the new work below grade.

  8. New walls & skylights during the Los Angeles warehouse fire rebuild
    08

    New walls & skylights

    New interior walls framed and boarded under the rebuilt roof, with new skylights bringing daylight back in.

Left: fire debris in the yard after the fire. Right: the warehouse brick blasted clean with openings secured

Arched bow-truss roof

Saving the roof that makes the building.

Bow-truss warehouses are known for their curved wood roofs. Instead of flattening the building, we kept the arched trusses, replaced the damaged framing and put a new deck on top — so the warehouse keeps its character and its open, column-free floor.

See all commercial services →

Fire rebuild

Get a bid for your fire or damage rebuild.

Send us the space and your plans or franchise package. We’ll walk the site, review what the city and health department will require, and send a detailed bid for the full build-out — demo, plumbing, framing, finishes and permits.

  • Full scope, one bidDemo, plumbing, framing, MEP, finishes and permits priced together
  • Built to code & brandCity code, health department requirements and your franchise standard
  • Plumbing done rightUnderground drains, water lines, floor sinks and grease interceptors
  • Opening-day focusedA schedule built around your lease and opening date

Free bid · No obligation

Request your bid

What do you need?
Please enter the business name.
Please enter the address.
Please enter your name.
Please enter a 10-digit phone number.
Please enter a valid email.

Prefer to talk? Call (562) 310-3596

No cost. No obligation. Your information is never shared.

Free Feasibility Report