Triplex to 5 unitsTwo ADUs + a garage on a triplex lot
An R3 lot that already had a triplex. We added two 400 sf detached units with a garage between them — five rentable units on one lot.
Build process · 7 phases
01 Site prep & layout
02 Excavation & underground
03 Foundation
04 Framing
05 Sheathing, roof & rough-ins
06 Lath, stucco & utilities
07 Finished & rented



















